A proposal that takes four days to draft and another week to chase down for signature loses to the contractor who sends a clean, signable document the day after the site visit.
Shortening the cycle is not about writing faster. It is about removing the manual steps between the estimate, the proposal, and the signature.
The three cuts that matter
First, draft estimates from templates and site notes automatically. Second, turn approved estimates into proposals with a single click. Third, send them for e-signature from inside the same platform so nothing lives in a separate document tool.
